Keep checking back with us to see our transformation of St. Ann's Community and Cherry Ridge. With the addition of the Wegman Transitional Care Center, the Leo Center for Caring and St. Ann's Care Center, we are continuing our mission to Person Centered Care.
The new main parking area on the Irondequoit campus has been completed. Taken 11/20/12
Paving work is nearing completion on the new roadway. Taken 11/6/12
Grading and rolling on the site that used to be The Heritage will become St. Ann's main parking area. Taken 11/6/12
A shot of the kitchen in one of the newly renovated apartments at Chapel Oaks.
This photo is taken from the kitchen looking out to the living room. The door on the far left left opens to a covered balcony.
Clean-up work continues on the site where The Heritage once stood. Taken 9/10/12
Demolition work on The Heritage. Taken 7/11/12
One of the new Parlor areas in the St. Ann's Transitional Care Center. Taken 3/26/12
A look at one of the new country kitchens in the St. Ann's Care Center at Cherry Ridge. Taken 1/24/12
A side view of the new St. Ann's Transitional Care Center. Taken 1/10/12
Workers putting the finishing touches on the main entrance to St. Ann's Care Center at Cherry Ridge. Taken 1/4/12
Exterior work continues on the new Palliative Care Center in Irondequoit. Taken 12/16/11
St. Ann's Transitional Care Center just before nightfall. Taken 12/8/11
With the exception of the main entrance, most of the front exterior work has been completed on St. Ann's Care Center at Cherry Ridge. Taken 12/8/11
A front view of the St. Ann's Care Center at Cherry Ridge. Taken 11/15/11
An "aerial" shot of the progress on the new Transitional Care Center at St. Ann's. Taken 11/10/11
A shot of the entrance and drop-off area at the new St. Ann's Transitional Care Center. Taken 11/4/11
Walkways and curbs going in on the Irondequoit Campus. Taken 10/12/11
The front roof work and most of the siding has been completed on the new building at Cherry Ridge in Webster. Taken 10/11/11
Another view of the progress at Cherry Ridge. Taken 10/11/11
Work continues at a fast pace on the Irondequoit campus. Taken 10/7/11
Siding work on the new Transitional / Palliative Care Center being built on the Irondequoit campus. Taken 9/21/11
A view of the connector between St. Ann's Home and the new Transitional / Palliative Care Center Taken 9/16/11
Siding work is nearing completion at Cherry Ridge.Taken 9/7/11
Roofing insulation is already up on the new building at Cherry Ridge in Webster. Taken 8/25/11
Work Continues on the new Transitional / Palliative Care Center going up at St. Ann's in Irondequoit. Taken 8/19/11
This shot from the 10th floor at St. Ann's shows a nice perspective of the progress. Taken 8/19/11
Roof work continues on the new Nursing and Transitional Care Center going up at Cherry Ridge in Webster. Taken 8/12/11
Siding is being installed on the new building going up at Cherry Ridge. Taken 8/12/11
Roof trusses being installed on the new building going up at Cherry Ridge. Taken 7/28/11
Brickwork and window installations continue on the new Transitional / Palliative Care Center on the St. Ann's campus. Taken 7/22/11
A side view of the new building going up on the Irondequoit campus with The Heritage in the background. Taken 7/22/11
A front view of the Skilled Nursing and Transitional Care Center being built at Cherry Ridge in Webster. Taken 7/12/11
The back of the new building on the Cherry Ridge campus. Taken 7/12/11
Windows are being installed in the new Transitional and Palliative Care Center. Taken 7/8/11
Brickwork being done on the new building going up on the Irondequoit campus. Taken 6/29/11
A shot of the elevator shaft in the new Transitional Care Center on the Irondequoit campus. Taken 6/16/11
Wall studs show what will be individual rooms at the new Transitional and Palliative Care Center on the Irondequoit campus. Taken 6/8/11
Exterior insulation work is almost complete on the Irondequoit campus. Taken 6/8/11
The skilled nursing / transitional care building at Cherry Ridge. Taken 5/25/11
Insulation is already up on the back of the skilled nursing / transitional care building at Cherry Ridge. Taken 5/25/11
Wall studs are going up on the new building in Irondequoit. Taken 5/16/11
The skilled nursing / transitional care building at Cherry Ridge is really taking shape. Taken 5/5/11
A shot of the new building going up at St. Ann's. Taken 5/5/11
A concrete base for the flooring has been installed in the new building on the Irondequoit campus. Taken 4/26/11
Metal decking is up on the new skilled nursing and transitional care building at Cherry Ridge. Taken 4/15/11
Metal decking is installed for the enclosed walkway to the new building going up at St. Ann's. Taken 4/8/11
Workers carefully get a steel beam into place with assistance from a large crane. This piece weighs well over 700 pounds. Taken 3/30/11
A very busy work site at St. Ann's. Taken 3/30/11
A view of the new Skilled Nursing and Transitional Care Center going up at Cherry Ridge. Taken 3/30/11
Structural insulation is in place for the expansion of Ray & Mary's Orchard Cafe at Cherry Ridge. Taken 3/30/11
Steel work on the new Transitional and Palliative Care Center on the Irondequoit campus. Taken 3/24/11
Progress being made on the new building going up at Cherry Ridge in Webster. Taken 3/14/11
Structural steel being placed for the Transitional and Palliative Care Center on the Portland Avenue campus. Taken 3/7/11
Pouring concrete on the Portland Avenue campus. Note the scaffolding has been removed from the tower. Taken 3/1/11
Work on the stair tower and elevator shaft on the Irondequoit campus. Taken 2/22/11
Buildings taking shape at Cherry Ridge. Taken 2/17/11
Workmen laying down pipe for plumbing at Cherry Ridge. Taken 2/17/11
Structural steel work for the expansion of the existing cafe at Cherry Ridge. Taken 2/11/11
Putting in the underground plumbing at Cherry Ridge.
The new building going up on the Irondequoit campus. Taken 2/9/11
More work on the Irondequoit campus. Taken 2/9/11
Putting in the footers for the expansion of the Ray & Mary's Orchard Cafe at Cherry Ridge. Taken 1/27/11
The stair tower for theTransitional and Palliative Care Center on the Portland Avenue campus. Taken 1/27/11
Basement and foundation walls are up for the new building on the Irondequoit campus. Taken 1/21/11
The stair tower and scaffolding are up at Cherry Ridge. Taken 1/13/11
Reinforcement of the wall structures at St. Ann's. Taken 1/13/11
Concrete is poured for the foundation of the skilled nursing building at Cherry Ridge. Taken 1/13/11
Construction on the Transitional and Palliative Care Center in Irondequoit. The 3 cylinder structures are part of the pistons for the future elevators.Taken 1/10/11
Foundation and wall construction work on the new skilled nursing building at Cherry Ridge. Taken 1/4/11
Basement and foundation construction for the Transitional and Palliative Care Center on the Irondequoit campus. Taken 1/5/11
Construction keeps moving forward even in near blizzard conditions. Taken 1/5/11
The Security Command Post on the Irondequoit campus is being demolished. It will become part of the connector which will link St. Ann's with the new Transitional / Palliative Care Center. The security office has been temporarily relocated.
The nursery near Chapel Oaks is a temporary home to many trees which will be moved and replanted when construction is completed. Instead of being cut down, these trees will be placed in new green spaces on our Irondequoit campus.
Pad preparation has started on one of the new buildings being built at Cherry Ridge.
Construction preparations and site work are underway in front of Rainier Grove at Cherry Ridge.
Pouring cement for the new road bed on the Irondequoit campus.
Construction vehicles and earth movers making a temporary parking area at St. Ann's.
Utility work and the installation of storm drains in front of the Heritage.
Construction at St Anns.